La Verne plays a vital role in supplying fresh water to some of California’s largest cities. When one of its pipes needed a major repair, the city contracted Dedicated Concrete Cutting and Cut It Up to do the work. The two veteran concrete-cutting experts turned to Pentruder® concrete cutting systems to make sure everything went off without a hitch.
The Challenge
The La Verne Water Treatment Facility needed to remove a massive 45-foot section of pipe by wall-sawing from the inside and wire-sawing the outer perimeter. And they had just 30 hours to do it. With only enough reservoir capacity to last about a week, the entire project—including replacing the section—was on a strict timeline.